Projects

Past Projects

Find out more about our past projects below.

Zafico, Zanzibar Fisheries Company | Tanzania

  • Electro-mechanical consultations

  • Design and supervision of multi-temperature rooms refrigeration system

  • 2019

6th of October Custom Storage Company CSC | 6th of October

  • Electro-mechanical consultations

  • Design and supervision of multi-temperature rooms refrigeration system

  • 2016-2019

El Dahra Company | Salhia City

  • Electro-mechanical contractor

  • Implementation of the refrigeration system for storing oranges

  • 2019

Palm Hills | Sadat City

  • Electro-mechanical contractor

  • Implementation of the refrigeration system for fast-cooling, freezing, and storing dates

  • 2019

MAFA | Nubaria

  • Electro-mechanical contractor

  • Implementation of the refrigeration rack system R407, 12 fast cooling rooms and 4 holding rooms

  • 2018

Ahmed Ezz | Sadat City

  • Electro-mechanical consultations

  • Packhouse for grapes and strawberries and Implementation of the refrigeration system

  • 2017

Green Valley | Alexandria

  • Electro-mechanical contractor

  • Implementation of the refrigeration system for processed fruit and vegetables (freezing tunnels and freezing rooms)

  • 2017

Al Fajr

  • Electro-mechanical consultations

  • Design of refrigeration system, storage capacity 20,000 ton of potatoes

  • 2015

HEIA Refrigerated Perishable Terminal | Luxor

  • Electro-mechanical contractor

  • Supply and Implementation of the Refrigeration system

  • 2014/2015

BELCO

  • Turnkey contractor for refrigeration system

  • Pre-cooler & storage for strawberries, green onions, and grapes

  • 2001-2015

El Omda | Kafr Refaay

  • Electro-mechanical consultations

  • Design of refrigeration system, storage capacity 175,000 ton of potatoes

  • 2013

Juhayna Dairy Factory

  • Main contractor

  • Design and implementation of the refrigeration systems (yoghurt tunnels & storage and ice bank for processed milk)

  • 1991/2013

EL LEHAA | Garf Husain Aswan

  • Electro-mechanical contractor

  • Implementation of the refrigeration system for a potato plant

  • 2010/2011

Fata

  • Design installation study & erection contractor

  • Pre-cooling and storage for grapes and apricot

  • 2008

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system for potatoes

  • 2008

Green Egypt

  • Installation study & erection contractor

  • Pre-cooling and storage for grapes and green beans

  • 2006

Blue Nile

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system (pre-cooling, storage and packing area A/C for grapes & green beans)

  • 2005/2006

Union of Producers and Exporters of Horticultural Crops (UPEHC)

  • Master Plan and preliminary studies for Avon project for Ismailia

  • 2005

MAFA

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system (wet system
    pre-cooling, storage and packing area A/C for cooling grapes & strawberries)

  • 2003/2004

Mansouria Turkey Slaughterhouse

  • Turnkey contractor

  • Implementation of the refrigeration system for tunnel & storage

  • 1996-2004

Delta Export

  • Turnkey contractor

  • Green onions pre-cooler & storage along with providing training sessions in handling and cooling fresh produce

  • 2000-2004

Noranto

  • Turnkey contractor for civil & refrigeration system

  • Cold facility for green beans

  • 2002-2004

Nimos Farms

  • Turnkey contractor

  • Implementation of the refrigeration system for grapes pre-cooling & storage

  • 1993-2004

HEIA Refrigerated Perishable Terminal | Cairo Airport

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system

  • 2002/2003

Techno-Green

  • Technical studies and site supervision

  • Colored pepper and strawberries pre-cooling & storage

  • 2003

Orchard

  • Turnkey contractor for civil & refrigeration system

  • Flowers and grapes pre-cooling & storage

  • 2003

Bona

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system (pre-cooling, storage and packing area A/C, for cooling grapes)

  • 2003

Balaika

  • Turnkey contractor for civil & refrigeration system

  • Organic banana ripening room & storage along with providing training sessions in handling and cooling fresh produce

  • 2003

Faitory | Tripoli, Libya

  • Carrier International’s subcontractor

  • Implementation of the refrigeration system

  • 2003

Nivex

  • Main Contractor

  • Implementation of the pre-cooling system for green beans

  • 2003

Green Farm

  • Technical studies and site supervision

  • Grapes pre-cooling & storage

  • 2002

El-Roda

  • Technical studies and site supervision

  • Grapes pre-cooling & storage

  • 2002

Zain El Deen

  • Turnkey contractor for civil & refrigeration system

  • Strawberries and colored pepper pre-cooler & storage along with providing training sessions in handling and cooling fresh produce

  • 2002

BELCO

  • Installation Study & Supervision

  • MSSP demo unit

  • 1999

El-Ahram

  • Electro-mechanical contractor

  • Implementation of the refrigeration system (printing press, films cold store)

  • 1996

Helwan Export

  • Main Contractor

  • Implementation of the pre-cooling system for green beans

  • 1996

Uncle America Factory for Processed Meat

  • Sabroe International’s subcontractor

  • Implementation of the refrigeration system (Central R22 refrigerated system, one (-38°C) tunnel, four (-18°C) storage rooms and processing area A/C)

  • 1994

Bristol – Myerrs Squibb

  • Electro-mechanical contractor

  • Implementation of the refrigeration system (medical factory, material cold store)

  • 1994

Shubra Shehab

  • Main Contractor

  • Implementation of the refrigeration system (military dairy farm chilled water system)

  • 1992

What we promise...we deliver!

Contact us for a free consultation today and we will be happy to guide you through the whole process from planning to commissioning!